Text size: Smaller Font View Normal Font View Larger Font View

Middle Tamor Hydropower Project (57 MW)

General features of Middle Tamor Hydropower project are presented below

General


Installed capacity

57 MW (as per license granted by DoED)

Project Location : 

Taplejung district

 

Linkhim/Khejenim/Hadewa/Sawadin and Phurambu VDCs,

Zone :  

Mechi Zone

Development region :

Eastern Development Region

Nearest highway :

Mechi Highway

Nearest Roadhead

Phunglin Bazaar, Taplejung

Climate :

Sub-tropical, Temperate & Alpine

Average temperature: 

Maximum : 18° in April

 

Minimum : -0.3° in February

 PROJECT LOCATIONS


Boundary Points

Locations

Longitude

Latitude

1

87° 42’ 40” E

27° 27’ 09” N

2

87° 42’ 40” E

27° 23’ 57” N

3

87° 40’ 18” E

27° 23’ 57” N

4

87° 40’ 18” E

27° 27’ 09” N

 

   HYDROLOGY


 

 

Catchment  Area 1962 km2

Annual mean flow

107.7 m3/s

 Maximum discharge

3770 m3/s (11 August 1987, 6760 m3/s at Gauging station 690, Mulghat)

 Minimum discharge

8.09 m3/s (17 March 1965, 26 m3/s at Gauging station 690, Mulghat)

 Design discharge

100  m3/s(33.3 % excedence of flow)(Tailwater tapping from Upper Tamor HP)

 

Project Components

Inverted Siphon                                                   5m wide,4 m high ,80 m long , 2 chambered  

Headrace Canal                                                  Trapezoidal reinforced concrete canal ,85 m long

Headpond                                                             Surface, volume : 13650 m3 , 2 min storage time

Head race Tunnel                                                 3.1 km(approx)

Surge Tank                                                             20 m dia. ,70 m long

Power House                                                         Semisurface

Turbine                                                                    5 units,Francis Turbine