Mai Cascade Hydropower Project (4.5 MW)

Preliminary Salient features of Mai Cascade Hydropower Project (4.5 MW)


Location

Danabari VDC, Ilam District

Hydrology at Intake

 

Catchment area

As per MHP

Design Flow

As per MHP

Minimum mean monthly flow

As per MHP

Maximum flood flow

As per MHP

Proposed Structures

Intake

Tailrace of the Mai Hydropower Project

    1. Tailrace of MHP                                  263.91m length , 3.5 m breadth ,3.8m height  
    2. Headrace Canal Of MCHP               3910.65m  long , 6.8m Top width ,206.m bottom width ,1:1500 longituditonal slope ,2.6 m height
    3. Intake Canal of MCHP                       188.06m length, 3.5m breadth ,3.8m height
    4. Flushing from headrace Canal        At  chainge 1324m ,Flushing canal lenght=109.7m,breadth=3m and height=3.5m
    5. Stream Crossings Detail                          

      Type:                                          Recatngular(R.C.C),breadth=206m ,height=206m

      Crossing 1                               12 m (chainge  477)
      Crossing 2                               15m(chainge  1529)
      Crossing 3                               15m (chainge 2389)
      Crossing 4                               15m (chainge 2963)
      Crossing 5                               15m (chainge 3484)

    6. Forebay                                                   66.40 m long, 12.80 m wide and 4.98 m depth
    7. Spillway at forbay                                  165m long,8m wide and 3.2m depth
    8. Penstock Pipe                                        66.58 m long, 2.5 m ø, 10 mm thick  and 11.51 m long, 1.2 4m ø, 12 mm thick, 2  pipes
    9. Power house                                          Reinforced Concrete(RCC), length =51.65m ,breadth=21.87m and height =16.18m
    10. Tailrce Canal                                          length =500m ,breadth= 5m and height= 2.5 m
    11. Turbine                                                    2 Nos Francis Turbine 
    12. Transmission line                                 33 KV, 3.5 -4 km

Energy:

  1. Gross Head                                                          42 meters
  2. Installed Capacity                                               4500 kW
  3. Average Annual Energy                                      31.02 GWh
  4. Average Dry Energy                                            6.56 GWh
  5. Average Wet Energy                                           24.46 GWh