Text size: Smaller Font View Normal Font View Larger Font View

Upper Tamor Hydropower Project.(415 MW)

     
STATUS:

Obtained Feasibility Study Licence and undertaking the study.

The Project is Located in the bordering area of Nepal and India. The distance between this 415 MW proposed Upper Tamor Project and the Rangit Project (60 MW) in Sikkim is 60 km

 

PRELIMINARY SALIENT FEATURES OF UPPER TAMOR PROJECT

1. General

  1. Project Location :                           Taplejung district Tapethok/Linkhim/Ikhabu and Lelep VDCs,
  2. Zone :                                                 Mechi Zone
  3. Development region :                     Eastern Development Region
  4. Nearest highway :                           Mechi Highway
  5. Climate :                                            Sub-tropical, Temperate & Alpine
  6. Average temperature:                  18° C in April,   -0.30 °C in February

2. Hydrology

  1. Catchment Area                         1850  km2
  2. Annual mean flow                      98 m3/s
  3. Maximum discharge                 2085 m3/s
  4. Minimum discharge                  8.09 m3/s
  5. Design discharge                      105  m3/s (33.3 % exceedance probability)

3. Project Components

  1. Dam:                                           Gravity type
  2. Undersluice :                            12.5 m * 18 m (B*H) @ 5 Nos
  3. Headpond:                                 Surface volume:733,09 m3, 2 hrs,storage time
  4. Settling Basin :                         170 m long,23m wide 100 3chambered
  5. Headrace Tunnel:                     8746m long
  6. Surge Tank:                               58m height,20m diameter
  7. Penstockpipe:                           4.7 m diameter
  8. Inclined Shaft                            683 m long
  9. Power house:                           Semi underground 
  10. Turbine:                                      83 MW Francis Turbines @ 5 Nos.
  11. Transmission line                    (Busantapur/Arun/Duhabi: 62 km /66km /145 km) (220 KV double circuit)      

4. Energy

  1. Gross Head:                             490 m
  2. Installed capacity :                 415 MW
  3. Average Annual Energy :      2117.6 GWh
  4. Firm  Energy:                           504.52 Gwh (From mid December to mid April)
  5. Secondary Energy :               1496.59 Gwh (From mid April to mid December)