Sanima Hydro & Engineering (P.) Ltd. (SHE) was established in March 2005 under the company act 2053 of Government of Nepal to conduct the feasibility study of hydropower projects including detailed engineering design, project management and construction supervision of the Projects.
To view the deatails of SHE, visit the website of Sanima Hydro & Engineering Private Limited Consulting Services
At the National Level
1. Upper Tamor Hydropower Project (415 MW) Client : Tamor Sanima Energy (P) Ltd . Assignment : Desk Study,Licensing, Feasibity study, EIA, Detailed Design, Tender Document Prepartaion Period : Ongoing 2. Middle Trishuli Hydropower Project (65 MW) Client: Perfect Energy Development Pvt. Ltd Assignments: Survey, Optimization study, Feasiblity study, EIA Period: Ongoing 3. Middle Tamor Hydropower Project (75 MW) Client : Tamor Sanima Energy Private Limited Assignment : Desk Study,Licensing, Feasibility Study, EIA Period: Ongoing 4. Lower Likhu Hydropower Project (28.1 MW) Client :Swet Ganga Hydropower and Construction (P) Ltd Assignment : Desk Study,Licensing , Feasibity Study, IEE Period : Ongoing 5. Siprin khola Hydroelectric Project,Dholakha (10 MW) Assignment : Progress monitoring and verification of construction work . Period : Ongoing 6. Lower Modi -I Hydropower Project ,Dolakha (10 MW) Assignment : Progress monitoring and verification of construction work Period: Ongoing 7. Mai Cascade Hydropower project (7 MW) Client : Sanima Mai Hydropower Ltd Assignment : Desk Study,Licensing , feasibility study, IEE, Detailed Design , Construction Supervision Period : Ongoing 8. Mai Hydropower Project (22 MW) Client : Sanima Mai Hydropower Ltd Assignment : Desk study ,Licensing ,feasibility study ,preparation of Tender document, detailed engineering design, Construciton supervision Period : Ongoing 9. Junbesi Hydropower Project (5 MW) Client : Dovan Hydropower (P) Ltd Assignment : Survery ,Optimization study,detaile feasibility study,Tender documents,detailed engineering design and IEE reports ,Structural design including reinforcemnt detailing Period : 2008-2009(completed) 10. Bhairabkund Small Hydroelectric Project (3 MW) Assignment : Feasibility study and tender documents preparations Period : 2008-2009 (completed) 11. Thotnae Khola Hydropower Project (740 KW) Client : Dovan Hydropower (P) Ltd Assignment : Feasibility study Period: 2008-2009(completed) 12. Ghami Small Hydorpower Project (330 KW) Client : National Trust for Nature Conservation /ACAP Consultant : North Engineering Co.P.Ltd in association with Sanima Hydro and Engineering P.Ltd Assignment : Project Planning,general Layout ,design of the project and preparation of Project description report Period : 2008-2009 (completed) 13 . Tinekhu Khola Small Hydropower Project (990 KW) Client : Hydro Innovation (P).Ltd Assignment :Feasibility study Period : 2008-2009(completed) 14. Thame Small Hydropower Project (600 KW) Client : Khumbu Bijuli Company (P)Ltd Assignment : Volunteer services as Techincal support for upgrading of the existing project Period: 2008(completed) 15. Odarey Micro Hydropower Project (12 KW) Assignment : Volunteer services as Techincal support for the proper maintainance of the existing project Period : 2008 (completed) 16. Namarjun Madi Hydropower Project (12 MW) Client : Himalayan Hydropower (P)Ltd Assignment : Feasibiity study review,Optimization of capacity,Preparatin of Tender document and Detail Engineering Design Period: 2007 (completed) 17. Upper Mai Hydropower Project (10 MW) Client : East Nepal Development Endeavour (P) Ltd Assignment :Feasibility Study Review and Detailed Design of Headworks Period :2007(completed) 18 . Pheme Khola Small Hydropower Project (999KW) Client : Khoranga Khola Hydropower Development Co(P) Ltd Assignment :Headworks design review ,Detailed Engineering Design of waterways and powerhouse and Construction Supervision Period : 2005-2007 (completed) 19. Mailun Khola Hydropower Company (P) Ltd. Assignment : Review of the Project Report Period :Completed 20. Tadi Hydropower Project (5 MW) Assignment: Due Diligence for Financial Institutions Period: Completed 21. Upper Chaku -A Hydroelectric Project (22.2 MW) Client : Citizens Bank International Limited Developer : Shree Shiva Hydropower Private Limited Assignments : Due diligence study of Upper Chaku -A Hydroelectric Project Status : Completed 22. Upper Puwa I Small Hydropower Project ( 3 MW) Client: Pime Commercial Bank Limited Developer: Joshi Hydropower Development Comapany Private Limited Assignment: Due diligence study of Puwa I Small Hydropower Project Status: Completed 23. Upper Syange Hydropower Project (2.4 MW) Client : Upper Syange Hydropower Company Private Limited Assignment : Review of feasibilty study Status: Completed
24. Khani Khola Hydropower Project(25 MW) Assignment: Progress monitoring and bill verification 25. Hewa Khola A Small Hydropower Project (14.9 MW) Assignment: Feasibility Study Review , Detailed design, Construction verification 26. Upper Mai Hydropower Project (9.98 MW) Assignment: Progress Monitoring and Bill verification
Our International Projects
1. Tagabai Hydropower Scheme,Kenya (1.7 MW) Client : Graeme Waston Associates (GWA) Assignment : Technical Assistant in Detail Design ,Feasibility study Drawing ,Detail Engineering preparation Period : Ongoing 2. North Mathioya Hydropower Scheme (3 MW) Client : Graeme Waston Associates (GWA) Assignment : Detailed design including HM/ Tender document Period :Ongoing 3. Keshim Small Hydropower ,Afghanistan (3 MW) Client : Integration Environment and Energy (GMBH) Assignment : Civil drawing update Period : Ongoing 4 . Kipchoria Hydropower Scheme (3 MW) Client : Integration Environment and Energy (GMBH) Assignment : Technical assistant in Detail Design ,Feasibility study drawing,Detail engineering drawing preparation Period : Ongoing 5. Khanabad Hydropower Station ,Afghanistan (1.8 MW) Client : Integration Environment and Energy (GMBH) Assignment : Detailed Structural Design of Powerhouse structure and Hydro Mechanical Drawings. Period : 2009 (completed) 6. Faizabad Small Hydropower Plant , Afghanistan(4.5 MW) Client : Integration Environment and Energy (GMBH) Assignment : Technical assistant in Detail Design,Feasibility study Drawing ,Detail Engineering Drawing preparation Period : 2009-2010 (completed) 7. Wayeva Fall, Liberia Assignment : Layout Preparation 8. Main River Fall, Liberia Assignment: Layout Preparation 9. Woze Hydropower Project , Liberia Assignment : Layout Preparation 10. Kipsonoi Kapkros Small Hydropower Project, Kenya (3 MW) Assignment: Detailed design including HM/ Tender document 11. Don Xom Hydropower Project, Laos (80 KW) Assignment: Detailed design including HM/ Tender document
DisciplinesSanima Hydropower covers all disciplines. Our staff has long experience and top expertise within all phases and technical disciplines of our projects, from preliminary studies through commissioning. |