The relevant experience of SHE are presented below At the National Level
1. Upper Tamor Hydropower Project (415 MW) Client : Sanima Hydropower (P) Ltd . Assignment : Desk Study,Licensing and Feasibity study Period : Ongoing 2. Middle Tamor Hydropower Project (57 MW) Client : Sanima Hydro and Engineering Assignment : Desk Study,Licensing, and Feasibility Study Period: Ongoing 3. Lower Likhu Hydropower Project (27.5 MW) Client :Swet Ganga Hydropower and Construction (P) Ltd Assignment : Desk Study,Licensing , and Feasibity Study Period : Ongoing 4. Siprin Khola Hydrolelectric Project ,Dolakha (10 MW) Assignment : Progress monitoring and verification of construction work . Period : Ongoing 5. Lower Modi -I Hydropower Project ,Dolakha (10 MW) Assignment : Progress monitoring and verification of construction work Period: Ongoing 6. Mai Cascade Hydropower project (4.8 MW) Client : Sanima Hydropower (P)Ltd Assignment : Desk Study,Licensing and feasibility study Period : Ongoing 7. Mai Hydropower Project (4.8 MW) Client : Sanima Mai Hydropower (P) Ltd Assignment : Desk study ,Licensing ,feasibility study ,preparation of Tender document and detailed engineering design Period : 2005- 2009 (completed) 8. Junbesi Hydropower Project (5 MW) Client : Dovan Hydropower (P) Ltd Assignment : Survery ,Optimization study,detaile feasibility study,Tender documents,detailed engineering design and IEE reports ,Structural design including reinforcemnt detailing Period : 2008-2009(completed) 9. Bhairabkund Small Hydroelectric Project (3 MW) Assignment : Feasibility study and tender documents preparations Period : 2008-2009 (completed) 10. Thotnae Khola Hydropower Project (740 KW) Client : Dovan Hydropower (P) Ltd Assignment : Feasibility study Period: 2008-2009(completed) 11. Ghami Small Hydorpower Project (330 KW) Client : National Trust for Nature Conservation /ACAP Consultant : North Engineering Co.P.Ltd in association with Sanima Hydro and Engineering P.Ltd Assignment : Project Planning,general Layout ,design of the project and preparation of Project description report Period : 2008-2009 (completed) 12 . Tinekhu Khola Small Hydropower Project (990 KW) Client : Hydro Innovation (P).Ltd Assignment :Feasibility study Period : 2008-2009(completed) 13. Thame Small Hydropower Project (600 KW) Client : Khumbu Bijuli Company (P)Ltd Assignment : Volunteer services as Techincal support for upgrading of the existing project Period: 2008(completed) 14. Odarey Micro Hydropower Project (12 KW) Assignment : Volunteer services as Techincal support for the proper maintainance of the existing project Period : 2008 (completed) 15. Namarjun Madi Hydropower Project (12 MW) Client : Himalayan Hydropower (P)Ltd Assignment : Feasibiity study review,Optimization of capacity,Preparatin of Tender document and Detail Engineering Design Period: 2007 (completed) 16. Upper Mai Hydropower Project (10 MW) Client : East Nepal Development Endeavour (P) Ltd Assignment :Feasibility Study Review and Detailed Design of Headworks Period :2007(completed) 17 . Pheme Khola Small Hydropower Project (999KW) Client : Khoranga Khola Hydropower Development Co(P) Ltd Assignment :Headworks design review ,Detailed Engineering Design of waterways and powerhouse and Construction Supervision Period : 2005-2007 (completed) 18. Mailun Khola Hydropower Company (P) Ltd. Assignment : Review of the Project Report Period :Completed
Our International Projects
1. Tagabai Hydropower Scheme,Kenya (1.7 MW) Client : Graeme Waston Associates (GWA) Assignment : Technical Assistant in Detail Design ,Feasibility study Drawing ,Detail Engineering preparation Period : Ongoing 2. North Mathioya Hydropower Scheme (3 MW) Client : Graeme Waston Associates (GWA) Assignment : Technical assistant in Detail Design ,Feasibility study drawing,Detail engineering drawing preparation Period :Ongoing 3. Keshim Small Hydropower ,Afghanistan (3 MW) Client : Integration Environment and Energy (GMBH) Assignment : Civil drawing update Period : Ongoing 4 . Kipchoria Hydropower Scheme (3 MW) Client : Integration Environment and Energy (GMBH) Assignment : Technical assistant in Detail Design ,Feasibility study drawing,Detail engineering drawing preparation Period : Ongoing 5. Khanabad Hydropower Station ,Afghanistan (1.8 MW) Client : Integration Environment and Energy (GMBH) Assignment : Detailed Structural Design of Powerhouse structure and Hydro Mechanical Drawings. Period : 2009 (completed) 6. Faizabad Small Hydropower Plant , Afghanistan(4.5 MW) Client : Integration Environment and Energy (GMBH) Assignment : Technical assistant in Detail Design,Feasibility study Drawing ,Detail Engineering Drawing preparation Period : 2009-2010 (completed) |