Text size: Smaller Font View Normal Font View Larger Font View

Lower Likhu Hydropower Project (27.5 MW)

Lower Likhu Hydropower Project

1. GENERAL


a. Installed capacity

27.5 MW (as per license granted by DoED)

b. Project Location : 

Dolakha and Ramechhap districts

 

Saipu, Bijulikot, Goth Gau VDCs

c. Zone :  

Janakpur/Sagarmatha Zone’s

d. Development region :

Central Development Region

e. Nearest highway :

Jiri Highway

f. Nearest Roadhead

Headwordks of project site

g. Climate :

Sub-tropical, Temperate & Alpine

h. Average temperature: 

Maximum : 36.3° in May

 

Minimum : 4.3° in January

2.  PROJECT COMPONENTS

a. Weir(type,length)                         

Boulder lined weir,47 m

b. Undersluice(No. ,b*h)

2.  6 m *6 m

c. Intake

 

    Type

Side Intake

    No of openings

3

    B*H

4.5  m * 2.85 m

d. General trap

 

    Type

Surface
    L*B*H,m 8*4.5*6
e.Settling Basin  
    Type Surface
     Number 3
     L*B*H 120 *12.5 * 8
f. Headrace culvert  
    Type Rectangular
    Length 1290 m
    Width 3.55 m
    Height 3.55 m
g. Headrace tunnel  
    Type Modified D -Shape

     Length

3440 m
     Diameter 5 m
h. Surge tank  
    Height 3.5 m
    Diameter 12 m
i. Penstock  
   Length 340 m
   Diameter 3.75 m

j. Powerhouse

 
   Type Semi surface
   Location Bijulikot ,VDC
   L*B*H (m)  
k.Tailrace culvert 7.3*22*24.47
   Type closed
   Length 125 m
   Height 3.55 m
   Breadth 3.55 m
l. Turbine  
   Type Francis
   Number 2
m.Transmission line,length,km ,(Khimti/Likhu Iv substation) 30/10
    Capacity,kv 132
   

3. Energy


a. Design discharge ,m3/s
28.5

b. Gross head,m

118

c. Installed Capacity,MW

27.5

d. Dry Energy,GWH

28.82

e. Wet Energy,GWH

134.70

f. Average annual gross engergy,GWh 163.52