Upper Tamor Hydropower Project (415 MW)

Upper Tamor Hydropower Project (415 MW)

           
STATUS:

Obtained Feasibility Study Licence and undertaking the study.

The Project is Located in the bordering area of Nepal and India. The distance between this 415 MW proposed Upper Tamor Project and the Rangit Project (60 MW) in Sikkim is 60 km

 

PRELIMINARY SALIENT FEATURES OF UPPER TAMOR PROJECT

1. General

  1. Project Location :                           Taplejung district Tapethok/Linkhim/Ikhabu and Lelep VDCs,
  2. Zone :                                                 Mechi Zone
  3. Development region :                     Eastern Development Region
  4. Nearest highway :                           Mechi Highway
  5. Climate :                                            Sub-tropical, Temperate & Alpine
  6. Average temperature:                  18° C in April,   -0.30 °C in February

2. Hydrology

  1. Catchment Area                              1850 km2
  2. Annual mean flow                            98 m3/s
  3. Maximum discharge                       2085 m3/s
  4. Minimum discharge                         8.09 m3/s
  5. Design discharge                             105 m3/s (33.3 % exceedance probability)

3. Project Components

  1. Dam:                                              Gravity Type
  2. Undersluice                                  12.5 m *18 m (B*H)@5 Nos
  3. Headponed,Surface,volume:    2 hrs,storage time
  4. Settling Basin :                             170m long,.23 m wide, 3 chambered
  5. Headrace Tunnel:                        8746m long
  6. Surge Tank:                                  58 m height,20 m diameter
  7. Inclined Shaft:                              683 m long
  8. Penstockpipe:                              3.0 m diameter
  9. Power house:                               Semi underground 
  10. Turbine:                                          83 MW Francis Turbines@5 Nos
  11. Transmission line:                      (Basnatapur/Arun/Duhabi =62km/66km/145km) 220 KV double circuit

4. Energy

  1. Gross Head:                                   490 m
  2. Installed capacity :                       415 MW
  3. Average Annual Energy:              2117.6 GWh
  4. Firm Energy:                                   158.75 Gwh (From mid December to mid April)