Middle Tamor Hydropower Project (57 MW)

Middle Tamor Hydropower Project (57 MW)
General features of Middle Tamor Hydropower project are presented below

General


Installed capacity

57 MW (as per license granted by DoED)

Project Location : 

Taplejung district

 

Linkhim/Khejenim/Hadewa/Sawadin and Phurambu VDCs,

Zone :  

Mechi Zone

Development region :

Eastern Development Region

Nearest highway :

Mechi Highway

Nearest Roadhead

Phunglin Bazaar, Taplejung

Climate :

Sub-tropical, Temperate & Alpine

Average temperature: 

Maximum : 18° in April

 

Minimum : -0.3° in February

 PROJECT LOCATIONS


Boundary Points

Locations

Longitude

Latitude

1

87° 42’ 40” E

27° 27’ 09” N

2

87° 42’ 40” E

27° 23’ 57” N

3

87° 40’ 18” E

27° 23’ 57” N

4

87° 40’ 18” E

27° 27’ 09” N

 

   HYDROLOGY


 Catchment Area

1962 km2

Annual mean flow

107.7 m3/s

 Maximum discharge

3770 m3/s (11 August 1987, 6760 m3/s at Gauging station 690, Mulghat)

 Minimum discharge

8.09  m3/s (17 March 1965, 26 m3/s at Gauging station 690, Mulghat)

Design discharge

100m3/s (33.3 % exceedence of flow)(Tailwater tappin from Upper Tamor HP)

 Project Components

Inverted siphon                                                    5m wide,4 m high,80 m long ,2 chambered

Headrace Canal                                                  Trapezoidal reinforced concrete canal,85 m long

Headpond                                                             Surface volume:13650 m3 , 2 mins, storage time

Head race Tunnel                                                 3.1 Km (approx) 

Surge Tank                                                            20 m dia ,70 m long

Penstock pipe                                                        4.7 m dia. ,70 m long

Power House                                                         Semi surface

Turbine                                                                    5 units,Francis Turbine